econometrics-check
Causal inference design audit for the sewage-house-prices project. Runs a 4-phase review (claim identification, design validity, inference, polish) covering hedonic pricing, repeat sales, long difference, DiD/event studies, upstream/downstream, and dry spill strategies. This skill should be used when asked to "check the econometrics", "audit the identification", "review the strategy", or when verifying that code matches the stated design.