OpenParable
Skip to content
← Back to skills

Wayland Hr Onboard Package

Productivity
wayland-hr-onboard-package

Wayland Hr Onboard Package is an Agent Skill for productivity published in the FerroxLabs/wayland repository on GitHub: a SKILL.md instruction file an AI agent can load to do this task.

Build a complete onboarding package for a new hire: a first-week plan, a 30/60/90-day milestone plan, and a paperwork checklist, shaped to the role and level, with review checkpoints before shipping. Use when the user wants a structured, multi-step process to produce a full onboarding package for a specific new hire. Do NOT use for a single onboarding checklist item or a one-line first-day note that one atomic skill can answer.

View on GitHub ↗
QUICK START

How to use this skill

Bring this guide into your coding agent with a prompt tailored to the tool you use.

  1. Open your project in Codex.
  2. Copy and paste the prompt below.
  3. Review files and risks before approving any action.
Prompt to paste
Inspect the Agent Skill at https://github.com/FerroxLabs/wayland/blob/HEAD/src/process/resources/bundled-workflows/bodies/wayland-hr-onboard-package/SKILL.md and all supporting files. Report provenance, permissions, scripts, dependencies, and security risks. Propose an exact installation into .agents/skills/wayland-hr-onboard-package, but wait for my approval before writing files or running scripts.

Copying this prompt does not install or run the skill. Review third-party files before use.

Build an Onboarding Package

Estimated time: 20-30 minutes

This workflow produces a complete onboarding package for one new hire: a first-week plan, a 30/60/90-day milestone plan, and a paperwork checklist. The user reviews and refines the first-week plan, then reviews the milestones and paperwork before shipping.

Steps

Step 1: Kick Off and Capture the Brief (uses: hr-onboard)

Ask the user for the role, start date, and manager, plus any company-specific onboarding cadence they already follow. Capture this as the brief. Do not proceed without role and start date.

  • Input: user-provided role, start date, manager, existing cadence
  • Output: brief
  • Key focus: role and start date anchor the whole package

Step 2: Infer the Onboarding Shape (uses: hr-onboard)

Using the hr-onboard skill, infer the recommended onboarding shape for this role and level. State the shape and the reasoning. Capture the shape.

  • Input: brief from Step 1
  • Output: onboarding shape
  • Key focus: match the shape to role and level

Step 3: Build the First-Week Plan (uses: hr-onboard)

Using the hr-onboard skill in first-week-plan mode with the brief and the onboarding shape, draft a day-by-day first-week plan. Show the full output.

  • Input: brief from Step 1, shape from Step 2
  • Output: first-week plan
  • Key focus: a concrete day-by-day first week

Step 4: Review the First-Week Plan (uses: hr-onboard)

Present the first-week plan and ask whether to refine or proceed to the 30/60/90 plan. If the user wants changes, gather feedback and re-run Step 3 with that feedback plus the brief, looping up to 2 times. When approved, advance.

  • Input: first-week plan from Step 3, user decision and feedback
  • Output: approved first-week plan
  • Key focus: loop on the first week only (max 2 iterations)

Step 5: Build the 30/60/90 Milestones (uses: hr-onboard)

Using the hr-onboard skill in 30/60/90-milestones mode with the brief and the approved first-week plan, draft the 30-, 60-, and 90-day milestones. Show the full output.

  • Input: brief from Step 1, approved first-week plan from Step 4
  • Output: 30/60/90 milestones
  • Key focus: measurable milestones at each horizon

Step 6: Build the Paperwork Checklist (uses: hr-onboard)

Using the hr-onboard skill in paperwork-checklist mode with the brief, draft the onboarding paperwork checklist. Show the full output.

  • Input: brief from Step 1
  • Output: paperwork checklist
  • Key focus: every required form and signature

Step 7: Final Review and Ship the Package (uses: hr-onboard)

Present the 30/60/90 milestones and paperwork checklist together. Ask whether to ship the package or refine the milestones or paperwork. If the user wants changes, gather feedback and re-run Step 5 with that feedback plus the approved first-week plan, looping up to 2 times. When approved, assemble the package with these sections: Onboarding Shape, First-Week Plan, 30/60/90 Milestones, Paperwork Checklist.

  • Input: milestones from Step 5, paperwork from Step 6, user decision
  • Output: onboarding package (assembled)
  • Key focus: assemble the four-section package only after the user ships