OpenParable
Skip to content
← Back to skills

Staged Gate Evaluation

Productivity
staged-gate-evaluation

Staged Gate Evaluation is an Agent Skill for productivity published in the yogsoth-ai/de-anthropocentric-research-engine repository on GitHub: a SKILL.md instruction file an AI agent can load to do this task.

Define gate criteria for each stage, evaluate candidates at each gate, and render go/kill/recycle decisions with evidence.

View on GitHub ↗
QUICK START

How to use this skill

Bring this guide into your coding agent with a prompt tailored to the tool you use.

  1. Open your project in Codex.
  2. Copy and paste the prompt below.
  3. Review files and risks before approving any action.
Prompt to paste
Inspect the Agent Skill at https://github.com/yogsoth-ai/de-anthropocentric-research-engine/blob/HEAD/skills/staged-gate-evaluation/SKILL.md and all supporting files. Report provenance, permissions, scripts, dependencies, and security risks. Propose an exact installation into .agents/skills/staged-gate-evaluation, but wait for my approval before writing files or running scripts.

Copying this prompt does not install or run the skill. Review third-party files before use.

Staged Gate Evaluation

Apply Stage-Gate methodology to evaluate a candidate at defined decision points. Each gate has explicit criteria, and the candidate receives a GO (proceed), KILL (terminate), or RECYCLE (rework and re-evaluate) verdict based on evidence.

Stages

  1. Gate Criteria Definition — Define what must be true for a candidate to pass each gate. Deploy gate-criteria-definition SOP for each stage gate.

  2. Gate Judgment — Evaluate the candidate against gate criteria and render a verdict. Deploy gate-judgment SOP at each gate.

  3. Feasibility Synthesis — Combine all gate verdicts and assessments into a final feasibility determination. Deploy feasibility-synthesis SOP.

Available SOPs

SOPStagePurpose
gate-criteria-definition1Define criteria and pass thresholds
gate-judgment2Evaluate and render verdict
feasibility-synthesis3Synthesize into final recommendation

Execution Guidance

  • Stage 1 should define >= 3 gates (e.g., concept feasibility, technical feasibility, implementation readiness)
  • Gate criteria should be specific, measurable, and evidence-based
  • Stage 2 evaluates sequentially — a KILL verdict at any gate terminates the evaluation
  • A RECYCLE verdict means the candidate returns to a prior stage with specific rework requirements
  • Stage 3 runs only after all gates have been evaluated (or a KILL is issued)
  • Document the evidence basis for every verdict

Minimum Yield

  • Gate verdicts (GO/KILL/RECYCLE) for each defined gate
  • Evidence supporting each verdict
  • Conditions for advancement (what would change a KILL to GO)
  • Final feasibility synthesis with recommendation

Available SOPs

Optional, no fixed order; the final leaf is always a sop.

SOPWhen to use
feasibility-synthesisSynthesize all assessments into a feasibility matrix, recommendation, and risk summary.
gate-criteria-definitionDefine gate criteria and pass thresholds for a specific stage in the Stage-Gate process.
gate-judgmentEvaluate a candidate against gate criteria and render GO/KILL/RECYCLE verdict with evidence.