an-task-split
将大任务拆分为多个子任务,每个子任务的 requirements 文档控制在 200 行以内。当用户想要:1) 拆分一个大任务 2) 将任务分解为多个小任务 3) 执行 /an-task-split 命令 4) 提到"任务拆分"、"分解任务"、"大任务"、"拆分"等关键词时触发此技能。
Browse reusable Agent Skills, each with a clear purpose and practical guidance.
将大任务拆分为多个子任务,每个子任务的 requirements 文档控制在 200 行以内。当用户想要:1) 拆分一个大任务 2) 将任务分解为多个小任务 3) 执行 /an-task-split 命令 4) 提到"任务拆分"、"分解任务"、"大任务"、"拆分"等关键词时触发此技能。
Condense old solved issue groups into one dated summary file, then delete the originals. Destructive, one consolidated confirm.
Triage a GitHub issue's comment thread into the curated, bucketed summary section of issue<N>_original.md.
Update the changelog when landing an issue: append a bullet to [Unreleased], or promote it to a release section after a version bump.
Capture a GitHub issue locally as issue<number>_original.md and archive other current issues by done status.
Park work on the current issue without closing it: update status, move the group to 02-partly-solved-issues/, optional WIP commit.
将已完成的 artifacts 产出目录归档到 artifacts/archive/ 目录。当用户想要:1) 归档一个 artifact 2) 清理已完成的任务产出 3) 执行 /an-archive 命令 4) 提到"归档"、"整理产出"、"清理产出"、"完成归档"等关键词时触发此技能。即使用户没有明确说"归档",只要是"这个任务做完了收一下"、"把 xxx artifact 归档"之类的意图,都应使用此技能。
Interrogate a written engineering implementation brief before work starts. Use when a user brings a ticket, PRD, design note, or substantive engineering task brief and wants to begin implementation planning; force every fixed rubric element to be accounted, cite present/weak claims against the brief, surface gaps, solution-as-goal traps, contradictions, and questions, then emit an intent-level plan. Do not use for bare one-line requests, non-engineering artifacts, code diff review, bug fixing, or execution itself.
连续性记录技能。同步项目进度、伏笔、角色变化和关键决策,保障跨集一致性。