Water Management Method
Otherswater-management-methodWater Management Method is an Agent Skill for general use published in the baojie/shiji-kb repository on GitHub: a SKILL.md instruction file an AI agent can load to do this task.
Use when planning irrigation canals, flood control, or water resource management for agriculture. Applies Yu's principle of channeling over blocking (疏导优于堵塞) and includes the Zheng Guo Canal case study.
QUICK START
How to use this skill
Bring this guide into your coding agent with a prompt tailored to the tool you use.
- Open your project in Codex.
- Copy and paste the prompt below.
- Review files and risks before approving any action.
Prompt to paste
Inspect the Agent Skill at https://github.com/baojie/shiji-kb/blob/HEAD/kg/ontology/ontology-v1/skus/procedural/skill_058/SKILL.md and all supporting files. Report provenance, permissions, scripts, dependencies, and security risks. Propose an exact installation into .agents/skills/water-management-method, but wait for my approval before writing files or running scripts.
Copying this prompt does not install or run the skill. Review third-party files before use.
Water Management Method (河渠治理法)
This method outlines procedures for managing water resources, including irrigation and flood control.
Historical Foundation
Based on Yu's flood control methods: 禹抑洪水十三年,过家不入门
Core Principles
- 疏导优于堵塞
- 因地制宜
- 综合利用
Flood Control Procedures
Step 1: Survey and Planning
- Map the river course from source to sea
- Identify flood-prone areas
- Determine natural drainage patterns
Step 2: Channel Management
- 疏浚河道
- 分流泄洪
- 筑堤防护
Step 3: Emergency Response
When floods occur:
- Assess breach location and severity
- Mobilize workers and materials
- Use appropriate materials:
- 薪柴
- 竹木
- 石块
- Implement temporary diversions while repairing
Irrigation Project Development
Step 1: Site Selection
- Choose land with water source access
- Assess soil quality (avoid saline land without treatment)
- Calculate gradient for gravity flow
Step 2: Canal Construction
- Main canal from water source
- Distribution network to fields
- Control structures for flow management
Step 3: Maintenance
- Regular dredging
- Embankment repair
- Seasonal adjustments
Case Study: Zheng Guo Canal
- Length: 300+ 里
- Irrigated: 40,000+ 顷
- Result: 关中为沃野,无凶年
Expected Outcomes
- Increased agricultural productivity
- Flood damage reduction
- Economic development
Validation
- Confirm the survey covers the full river course from source to sea with flood-prone areas and natural drainage patterns identified
- Verify that the channeling principle (疏导优于堵塞) is followed — diversion and dredging are preferred over damming alone
- Check that maintenance schedules are established for regular dredging, embankment repair, and seasonal adjustments