River Channel Development
Othersriver-channel-developmentRiver Channel Development is an Agent Skill for general use published in the baojie/shiji-kb repository on GitHub: a SKILL.md instruction file an AI agent can load to do this task.
Use when planning river navigation routes or developing drainage channels. Maps nine major river systems from source to terminus, guides dredging, embankment construction, and integration into tribute transportation networks.
How to use this skill
Bring this guide into your coding agent with a prompt tailored to the tool you use.
- Open your project in Codex.
- Copy and paste the prompt below.
- Review files and risks before approving any action.
Inspect the Agent Skill at https://github.com/baojie/shiji-kb/blob/HEAD/kg/ontology/ontology-v1/skus/procedural/skill_011/SKILL.md and all supporting files. Report provenance, permissions, scripts, dependencies, and security risks. Propose an exact installation into .agents/skills/river-channel-development, but wait for my approval before writing files or running scripts.
Copying this prompt does not install or run the skill. Review third-party files before use.
Nine Rivers Channel Development
A systematic approach to developing major waterways for navigation and flood control.
Overview
This procedure documents the nine major river systems and their development for transportation and water management.
Major River Systems
- 弱水 - Flows to 合黎, remainder to 流沙
- 黑水 - To 三危, enters 南海
- 河 - From 积石 to 龙门, south to 华阴, east to sea via nine branches
- 瀁/汉水 - From 嶓冢, becomes 汉水, enters Yangtze
- 江 - From 汶山, branches to 沱, enters sea
- 沇/济水 - Becomes 济水, enters Yellow River, exits at 陶丘
- 淮 - From 桐柏, joins 泗 and 沂, enters sea
- 渭 - From 鸟鼠同穴, joins 沣 and 泾, enters Yellow River
- 雒 - From 熊耳, joins 涧, 瀍, and 伊, enters Yellow River
Development Steps
-
Source Identification
- Locate river origin
- Document starting elevation
-
Course Mapping
- Trace river path
- Note confluences with other rivers
- Identify termination point
-
Channel Improvement
- Dredge obstructed sections
- Create bypass channels where needed
- Build embankments
-
Navigation Setup
- Ensure minimum depth for boats
- Clear obstacles
- Establish landing points
-
Integration
- Connect to broader water network
- Link to tribute transportation routes
Expected Outcomes
- Navigable waterways
- Flood control infrastructure
- Integrated transportation network
Validation
- Verify that each of the nine river systems has a documented source, course, confluences, and termination point
- Confirm that obstructed sections have been dredged and bypass channels constructed where needed
- Check that all developed waterways connect to the broader tribute transportation network